tender for construction of badminton court construction sub base and base 168 sqm , supply and stacking of graded stone aggregate , providing and laying wet mix macadam on prepared sub grade sub base , providing and applying tack coat using hot straight run bitumen , providing and laying 15mm thick premix bituminous macadam base course with stone aggregate , providing and laying 15mm thick semidence bituminous concrete using material aggregate , curbing , providing and laying stone soling dully hand packed , providing and laying in position cement concrete , providing and laying in position specified grade of cement concrete , centring and shuttering , synthetic layer , supply and installation of badminton post , badminton racket branded , water remover roller imported , water drainage system , tarpaulin , digital score board with accessories 2 by 3 , led sports light , installation and commission charges, construction of badminton court, construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete, supply & stacking of graded stone aggregate stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with prr of 8-10 tonne capacity etc. complete with all carriage. base course with stone aggregate 63-45mm incl. stone screening 13.2mm, providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per irc/most specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100kn capacity speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade and x-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc, providing and applying tack coat using hot straight run bitumen of grade 80 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc., providing and laying 15mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in morth and straight run bitumen of grade 80 100 3 by weight of total mix 60kg cum, providing and laying 15mm thick semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5 binder content by weight of total mix bitumen of grade 80/100 2.88kgs/sqm, curbing earthwork excavation by manual means in trenches in all kinds of soil for foundations incl. disposal of excavated earth beyond the site or as directed, disposed earth is to be levelled and neatly dressed incl. dewatering of trenches during execution if required., providing and laying stone soling dully hand packed incl ramming with heavy hand rammer all carriage upto site of work, providing and laying in position cement concrete of specified grade excl. the cost of cantering, shuttering in 1 4 8 with 1cement 4 coarse sand 8 graded stone agg. 40mm nominal size crushed aggregate incl. all carriage upto site of work., providing and laying in position specified grade of cement concrete in 1 1.5 3 1 cement 1.5 course sand 3 graded stone agg 20mm nominal size aggregates excl. the cost of cantering shuttering finishing ,in beams, lintels, slab etc up to floor v-level, centering and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns, synthetic layer. all weather synthetic surface 8 layers 1 layer of filler resurface, 3 layer of fine cushion, 3 layer of colour, 1 layer court line marking, supply & installation of badminton post with net pulley system (movable type) of approved quality and standard manufacturer., badminton racket branded (regular palms & light weight), water remover roller imported, water drainage system, tarpaulin 20ft x 45ft, digital score board with accessories 2 by 3, led sports light installation of four 20 feet height ms electric pole from ground level ms medium pipe including square frame for lights make a square frame of ms pipe and installation 2 each poles 150 watt led light including mcb/aluminium wire/switch board with control unit etc., installation and commission charges

Latest Tender Detail from indian army for the tender for construction of badminton court construction sub base and base 168 sqm , supply and stacking of graded stone aggregate , providing and laying wet mix macadam on prepared sub grade sub base , providing and applying tack coat using hot straight run bitumen , providing and laying 15mm thick premix bituminous macadam base course with stone aggregate , providing and laying 15mm thick semidence bituminous concrete using material aggregate , curbing , providing and laying stone soling dully hand packed , providing and laying in position cement concrete , providing and laying in position specified grade of cement concrete , centring and shuttering , synthetic layer , supply and installation of badminton post , badminton racket branded , water remover roller imported , water drainage system , tarpaulin , digital score board with accessories 2 by 3 , led sports light , installation and commission charges, construction of badminton court, construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete, supply & stacking of graded stone aggregate stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with prr of 8-10 tonne capacity etc. complete with all carriage. base course with stone aggregate 63-45mm incl. stone screening 13.2mm, providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per irc/most specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100kn capacity speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade and x-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc, providing and applying tack coat using hot straight run bitumen of grade 80 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc., providing and laying 15mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in morth and straight run bitumen of grade 80 100 3 by weight of total mix 60kg cum, providing and laying 15mm thick semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5 binder content by weight of total mix bitumen of grade 80/100 2.88kgs/sqm, curbing earthwork excavation by manual means in trenches in all kinds of soil for foundations incl. disposal of excavated earth beyond the site or as directed, disposed earth is to be levelled and neatly dressed incl. dewatering of trenches during execution if required., providing and laying stone soling dully hand packed incl ramming with heavy hand rammer all carriage upto site of work, providing and laying in position cement concrete of specified grade excl. the cost of cantering, shuttering in 1 4 8 with 1cement 4 coarse sand 8 graded stone agg. 40mm nominal size crushed aggregate incl. all carriage upto site of work., providing and laying in position specified grade of cement concrete in 1 1.5 3 1 cement 1.5 course sand 3 graded stone agg 20mm nominal size aggregates excl. the cost of cantering shuttering finishing ,in beams, lintels, slab etc up to floor v-level, centering and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns, synthetic layer. all weather synthetic surface 8 layers 1 layer of filler resurface, 3 layer of fine cushion, 3 layer of colour, 1 layer court line marking, supply & installation of badminton post with net pulley system (movable type) of approved quality and standard manufacturer., badminton racket branded (regular palms & light weight), water remover roller imported, water drainage system, tarpaulin 20ft x 45ft, digital score board with accessories 2 by 3, led sports light installation of four 20 feet height ms electric pole from ground level ms medium pipe including square frame for lights make a square frame of ms pipe and installation 2 each poles 150 watt led light including mcb/aluminium wire/switch board with control unit etc., installation and commission charges in srinagar, jammu & kashmir,. Reference number 15475823. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15475823
Tender ID:GEM/2026/B/7495569
Tender Agency:indian army
City:srinagar
State:jammu & kashmir
Description :
total quantity = 773
T18 Ref No:15475823Tender Value:1600000
Tender ID:GEM/2026/B/7495569Tender EMD:48000
Tender Agency:indian armyTender Fee:Refer Document
City:srinagarPublished Date:May 21, 2026
State:jammu & kashmirDue Date:Jun 11, 2026
Tender Related Keywords :-Tender Opening Date:Jun 11, 2026
Description :total quantity = 773

Get Complete Tender Documents to Participate

Tender NoticeBOQEligibilityEMD DetailsImportant Dates
We take all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Browse GeM Portal Tenders

This Government Tender has been Published  by Indian Army for work related to in Srinagar, Jammu & Kashmir. The Tender work is tender for construction of badminton court construction sub base and base 168 sqm , supply and stacking of graded stone aggregate , providing and laying wet mix macadam on prepared sub grade sub base , providing and applying tack coat using hot straight run bitumen , providing and laying 15mm thick premix bituminous macadam base course with stone aggregate , providing and laying 15mm thick semidence bituminous concrete using material aggregate , curbing , providing and laying stone soling dully hand packed , providing and laying in position cement concrete , providing and laying in position specified grade of cement concrete , centring and shuttering , synthetic layer , supply and installation of badminton post , badminton racket branded , water remover roller imported , water drainage system , tarpaulin , digital score board with accessories 2 by 3 , led sports light , installation and commission charges, construction of badminton court, construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete, supply & stacking of graded stone aggregate stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with prr of 8-10 tonne capacity etc. complete with all carriage. base course with stone aggregate 63-45mm incl. stone screening 13.2mm, providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per irc/most specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100kn capacity speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade and x-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc, providing and applying tack coat using hot straight run bitumen of grade 80 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc., providing and laying 15mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in morth and straight run bitumen of grade 80 100 3 by weight of total mix 60kg cum, providing and laying 15mm thick semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5 binder content by weight of total mix bitumen of grade 80/100 2.88kgs/sqm, curbing earthwork excavation by manual means in trenches in all kinds of soil for foundations incl. disposal of excavated earth beyond the site or as directed, disposed earth is to be levelled and neatly dressed incl. dewatering of trenches during execution if required., providing and laying stone soling dully hand packed incl ramming with heavy hand rammer all carriage upto site of work, providing and laying in position cement concrete of specified grade excl. the cost of cantering, shuttering in 1 4 8 with 1cement 4 coarse sand 8 graded stone agg. 40mm nominal size crushed aggregate incl. all carriage upto site of work., providing and laying in position specified grade of cement concrete in 1 1.5 3 1 cement 1.5 course sand 3 graded stone agg 20mm nominal size aggregates excl. the cost of cantering shuttering finishing ,in beams, lintels, slab etc up to floor v-level, centering and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns, synthetic layer. all weather synthetic surface 8 layers 1 layer of filler resurface, 3 layer of fine cushion, 3 layer of colour, 1 layer court line marking, supply & installation of badminton post with net pulley system (movable type) of approved quality and standard manufacturer., badminton racket branded (regular palms & light weight), water remover roller imported, water drainage system, tarpaulin 20ft x 45ft, digital score board with accessories 2 by 3, led sports light installation of four 20 feet height ms electric pole from ground level ms medium pipe including square frame for lights make a square frame of ms pipe and installation 2 each poles 150 watt led light including mcb/aluminium wire/switch board with control unit etc., installation and commission charges. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for construction of badminton court construction sub base and base 168 sqm , supply and stacking of graded stone aggregate , providing and laying wet mix macadam on prepared sub grade sub base , providing and applying tack coat using hot straight run bitumen , providing and laying 15mm thick premix bituminous macadam base course with stone aggregate , providing and laying 15mm thick semidence bituminous concrete using material aggregate , curbing , providing and laying stone soling dully hand packed , providing and laying in position cement concrete , providing and laying in position specified grade of cement concrete , centring and shuttering , synthetic layer , supply and installation of badminton post , badminton racket branded , water remover roller imported , water drainage system , tarpaulin , digital score board with accessories 2 by 3 , led sports light , installation and commission charges, construction of badminton court, construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete, supply & stacking of graded stone aggregate stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with prr of 8-10 tonne capacity etc. complete with all carriage. base course with stone aggregate 63-45mm incl. stone screening 13.2mm, providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per irc/most specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100kn capacity speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade and x-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc, providing and applying tack coat using hot straight run bitumen of grade 80 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc., providing and laying 15mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in morth and straight run bitumen of grade 80 100 3 by weight of total mix 60kg cum, providing and laying 15mm thick semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5 binder content by weight of total mix bitumen of grade 80/100 2.88kgs/sqm, curbing earthwork excavation by manual means in trenches in all kinds of soil for foundations incl. disposal of excavated earth beyond the site or as directed, disposed earth is to be levelled and neatly dressed incl. dewatering of trenches during execution if required., providing and laying stone soling dully hand packed incl ramming with heavy hand rammer all carriage upto site of work, providing and laying in position cement concrete of specified grade excl. the cost of cantering, shuttering in 1 4 8 with 1cement 4 coarse sand 8 graded stone agg. 40mm nominal size crushed aggregate incl. all carriage upto site of work., providing and laying in position specified grade of cement concrete in 1 1.5 3 1 cement 1.5 course sand 3 graded stone agg 20mm nominal size aggregates excl. the cost of cantering shuttering finishing ,in beams, lintels, slab etc up to floor v-level, centering and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns, synthetic layer. all weather synthetic surface 8 layers 1 layer of filler resurface, 3 layer of fine cushion, 3 layer of colour, 1 layer court line marking, supply & installation of badminton post with net pulley system (movable type) of approved quality and standard manufacturer., badminton racket branded (regular palms & light weight), water remover roller imported, water drainage system, tarpaulin 20ft x 45ft, digital score board with accessories 2 by 3, led sports light installation of four 20 feet height ms electric pole from ground level ms medium pipe including square frame for lights make a square frame of ms pipe and installation 2 each poles 150 watt led light including mcb/aluminium wire/switch board with control unit etc., installation and commission charges, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Indian Army usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Srinagar , Jammu & Kashmir tender on a single page. Businesses involved in related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for construction of badminton court construction sub base and base 168 sqm , supply and stacking of graded stone aggregate , providing and laying wet mix macadam on prepared sub grade sub base , providing and applying tack coat using hot straight run bitumen , providing and laying 15mm thick premix bituminous macadam base course with stone aggregate , providing and laying 15mm thick semidence bituminous concrete using material aggregate , curbing , providing and laying stone soling dully hand packed , providing and laying in position cement concrete , providing and laying in position specified grade of cement concrete , centring and shuttering , synthetic layer , supply and installation of badminton post , badminton racket branded , water remover roller imported , water drainage system , tarpaulin , digital score board with accessories 2 by 3 , led sports light , installation and commission charges, construction of badminton court, construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete, supply & stacking of graded stone aggregate stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with prr of 8-10 tonne capacity etc. complete with all carriage. base course with stone aggregate 63-45mm incl. stone screening 13.2mm, providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per irc/most specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100kn capacity speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade and x-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc, providing and applying tack coat using hot straight run bitumen of grade 80 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc., providing and laying 15mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in morth and straight run bitumen of grade 80 100 3 by weight of total mix 60kg cum, providing and laying 15mm thick semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5 binder content by weight of total mix bitumen of grade 80/100 2.88kgs/sqm, curbing earthwork excavation by manual means in trenches in all kinds of soil for foundations incl. disposal of excavated earth beyond the site or as directed, disposed earth is to be levelled and neatly dressed incl. dewatering of trenches during execution if required., providing and laying stone soling dully hand packed incl ramming with heavy hand rammer all carriage upto site of work, providing and laying in position cement concrete of specified grade excl. the cost of cantering, shuttering in 1 4 8 with 1cement 4 coarse sand 8 graded stone agg. 40mm nominal size crushed aggregate incl. all carriage upto site of work., providing and laying in position specified grade of cement concrete in 1 1.5 3 1 cement 1.5 course sand 3 graded stone agg 20mm nominal size aggregates excl. the cost of cantering shuttering finishing ,in beams, lintels, slab etc up to floor v-level, centering and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns, synthetic layer. all weather synthetic surface 8 layers 1 layer of filler resurface, 3 layer of fine cushion, 3 layer of colour, 1 layer court line marking, supply & installation of badminton post with net pulley system (movable type) of approved quality and standard manufacturer., badminton racket branded (regular palms & light weight), water remover roller imported, water drainage system, tarpaulin 20ft x 45ft, digital score board with accessories 2 by 3, led sports light installation of four 20 feet height ms electric pole from ground level ms medium pipe including square frame for lights make a square frame of ms pipe and installation 2 each poles 150 watt led light including mcb/aluminium wire/switch board with control unit etc., installation and commission charges from Srinagar, Jammu & Kashmir may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Indian Army in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for construction of badminton court construction sub base and base 168 sqm , supply and stacking of graded stone aggregate , providing and laying wet mix macadam on prepared sub grade sub base , providing and applying tack coat using hot straight run bitumen , providing and laying 15mm thick premix bituminous macadam base course with stone aggregate , providing and laying 15mm thick semidence bituminous concrete using material aggregate , curbing , providing and laying stone soling dully hand packed , providing and laying in position cement concrete , providing and laying in position specified grade of cement concrete , centring and shuttering , synthetic layer , supply and installation of badminton post , badminton racket branded , water remover roller imported , water drainage system , tarpaulin , digital score board with accessories 2 by 3 , led sports light , installation and commission charges, construction of badminton court, construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete, supply & stacking of graded stone aggregate stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with prr of 8-10 tonne capacity etc. complete with all carriage. base course with stone aggregate 63-45mm incl. stone screening 13.2mm, providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per irc/most specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100kn capacity speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade and x-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc, providing and applying tack coat using hot straight run bitumen of grade 80 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc., providing and laying 15mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in morth and straight run bitumen of grade 80 100 3 by weight of total mix 60kg cum, providing and laying 15mm thick semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5 binder content by weight of total mix bitumen of grade 80/100 2.88kgs/sqm, curbing earthwork excavation by manual means in trenches in all kinds of soil for foundations incl. disposal of excavated earth beyond the site or as directed, disposed earth is to be levelled and neatly dressed incl. dewatering of trenches during execution if required., providing and laying stone soling dully hand packed incl ramming with heavy hand rammer all carriage upto site of work, providing and laying in position cement concrete of specified grade excl. the cost of cantering, shuttering in 1 4 8 with 1cement 4 coarse sand 8 graded stone agg. 40mm nominal size crushed aggregate incl. all carriage upto site of work., providing and laying in position specified grade of cement concrete in 1 1.5 3 1 cement 1.5 course sand 3 graded stone agg 20mm nominal size aggregates excl. the cost of cantering shuttering finishing ,in beams, lintels, slab etc up to floor v-level, centering and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns, synthetic layer. all weather synthetic surface 8 layers 1 layer of filler resurface, 3 layer of fine cushion, 3 layer of colour, 1 layer court line marking, supply & installation of badminton post with net pulley system (movable type) of approved quality and standard manufacturer., badminton racket branded (regular palms & light weight), water remover roller imported, water drainage system, tarpaulin 20ft x 45ft, digital score board with accessories 2 by 3, led sports light installation of four 20 feet height ms electric pole from ground level ms medium pipe including square frame for lights make a square frame of ms pipe and installation 2 each poles 150 watt led light including mcb/aluminium wire/switch board with control unit etc., installation and commission charges issued by Indian Army for related work in Srinagar, Jammu & Kashmir? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of , Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding parameters and guide you on how to coordinate efficiently with the procurement team of Indian Army

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for Tender For Construction Of Badminton Court Construction Sub Base And Base 168 Sqm , Supply And Stacking Of Graded Stone Aggregate , Providing And Laying Wet Mix Macadam On Prepared Sub Grade Sub Base , Providing And Applying Tack Coat Using Hot Straight Run Bitumen , Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate , Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate , Curbing , Providing And Laying Stone Soling Dully Hand Packed , Providing And Laying In Position Cement Concrete , Providing And Laying In Position Specified Grade Of Cement Concrete , Centring And Shuttering , Synthetic Layer , Supply And Installation Of Badminton Post , Badminton Racket Branded , Water Remover Roller Imported , Water Drainage System , Tarpaulin , Digital Score Board With Accessories 2 By 3 , Led Sports Light , Installation And Commission Charges, Construction Of Badminton Court, Construction Sub Base & Base 168 Sqm Preparation Of Sub Grade By Excavating Earth To An Average Of 22.5cm Depth, Dressing And Consolidation With Power Road Roller Of 8-10 Tonne Capacity Incl. Making Good The Undulations Etc. With Earth Or Quarry Spoils Etc. And Rerolling The Subgrade Incl. Disposal Of Excavated Soil Upto 100 Mtrs Or As Directed By Engineer Incharge At Site Disposed Earth Is To Be Levelled & Neatly Dressed With All Leads, Lifts And Carriages Complete, Supply & Stacking Of Graded Stone Aggregate Stone Screening And Binding Material At Site Incl. Laying Of Water Bound Macaddam With Specified Stone Aggregate, Stone Screening And Binding Material Incl. Screening, Sorting, Spreading To Template And Consolidation With Prr Of 8-10 Tonne Capacity Etc. Complete With All Carriage. Base Course With Stone Aggregate 63-45mm Incl. Stone Screening 13.2mm, Providing And Laying Wet Mix Macadam On Prepared Sub Grade/sub Base With Crushed Quarry Stone Aggregate Of Specified Grading As Per Irc/most Specification Including Mixing Crushed Material With Predetermined Quantity Of Water In Accordance With Specification To Form Dense Mass Which Is Spread And Rolled With Vibratory Roller 80/100kn Capacity Speed Of Which Should Not Exceed 5km/hour For Each Layer, Rolling Should Continue Till 98% Density Is Achieved To Approved Grade And X-section The Mixing Is To Be Prepared In Approved Mech, Mixing Plant Of Suitable Capacity Including Laying Of Cold Emulsion With Pressure Sprayer At The Rate 0.75 Kgs/sqm Complete, Including Cost Of All Materials, All Leads Lifts Octroi Charge Taxes Etc, Providing And Applying Tack Coat Using Hot Straight Run Bitumen Of Grade 80 100 Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface To Remove All Dirt, Dust, Mud Etc., Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate Of Quality Size And Grading As Specified In Morth And Straight Run Bitumen Of Grade 80 100 3 By Weight Of Total Mix 60kg Cum, Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate Satisfying The Gradation Set Out In Specification With 5 Binder Content By Weight Of Total Mix Bitumen Of Grade 80/100 2.88kgs/sqm, Curbing Earthwork Excavation By Manual Means In Trenches In All Kinds Of Soil For Foundations Incl. Disposal Of Excavated Earth Beyond The Site Or As Directed, Disposed Earth Is To Be Levelled And Neatly Dressed Incl. Dewatering Of Trenches During Execution If Required., Providing And Laying Stone Soling Dully Hand Packed Incl Ramming With Heavy Hand Rammer All Carriage Upto Site Of Work, Providing And Laying In Position Cement Concrete Of Specified Grade Excl. The Cost Of Cantering, Shuttering In 1 4 8 With 1cement 4 Coarse Sand 8 Graded Stone Agg. 40mm Nominal Size Crushed Aggregate Incl. All Carriage Upto Site Of Work., Providing And Laying In Position Specified Grade Of Cement Concrete In 1 1.5 3 1 Cement 1.5 Course Sand 3 Graded Stone Agg 20mm Nominal Size Aggregates Excl. The Cost Of Cantering Shuttering Finishing ,in Beams, Lintels, Slab Etc Up To Floor V-level, Centering And Shuttering Incl Strutting Propping Etc And Removal Of Form Work For Foundation Footing Bases Of Columns, Synthetic Layer. All Weather Synthetic Surface 8 Layers 1 Layer Of Filler Resurface, 3 Layer Of Fine Cushion, 3 Layer Of Colour, 1 Layer Court Line Marking, Supply & Installation Of Badminton Post With Net Pulley System (movable Type) Of Approved Quality And Standard Manufacturer., Badminton Racket Branded (regular Palms & Light Weight), Water Remover Roller Imported, Water Drainage System, Tarpaulin 20ft X 45ft, Digital Score Board With Accessories 2 By 3, Led Sports Light Installation Of Four 20 Feet Height Ms Electric Pole From Ground Level Ms Medium Pipe Including Square Frame For Lights Make A Square Frame Of Ms Pipe And Installation 2 Each Poles 150 Watt Led Light Including Mcb/aluminium Wire/switch Board With Control Unit Etc., Installation And Commission Charges . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Indian Army.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for Tender For Construction Of Badminton Court Construction Sub Base And Base 168 Sqm , Supply And Stacking Of Graded Stone Aggregate , Providing And Laying Wet Mix Macadam On Prepared Sub Grade Sub Base , Providing And Applying Tack Coat Using Hot Straight Run Bitumen , Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate , Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate , Curbing , Providing And Laying Stone Soling Dully Hand Packed , Providing And Laying In Position Cement Concrete , Providing And Laying In Position Specified Grade Of Cement Concrete , Centring And Shuttering , Synthetic Layer , Supply And Installation Of Badminton Post , Badminton Racket Branded , Water Remover Roller Imported , Water Drainage System , Tarpaulin , Digital Score Board With Accessories 2 By 3 , Led Sports Light , Installation And Commission Charges, Construction Of Badminton Court, Construction Sub Base & Base 168 Sqm Preparation Of Sub Grade By Excavating Earth To An Average Of 22.5cm Depth, Dressing And Consolidation With Power Road Roller Of 8-10 Tonne Capacity Incl. Making Good The Undulations Etc. With Earth Or Quarry Spoils Etc. And Rerolling The Subgrade Incl. Disposal Of Excavated Soil Upto 100 Mtrs Or As Directed By Engineer Incharge At Site Disposed Earth Is To Be Levelled & Neatly Dressed With All Leads, Lifts And Carriages Complete, Supply & Stacking Of Graded Stone Aggregate Stone Screening And Binding Material At Site Incl. Laying Of Water Bound Macaddam With Specified Stone Aggregate, Stone Screening And Binding Material Incl. Screening, Sorting, Spreading To Template And Consolidation With Prr Of 8-10 Tonne Capacity Etc. Complete With All Carriage. Base Course With Stone Aggregate 63-45mm Incl. Stone Screening 13.2mm, Providing And Laying Wet Mix Macadam On Prepared Sub Grade/sub Base With Crushed Quarry Stone Aggregate Of Specified Grading As Per Irc/most Specification Including Mixing Crushed Material With Predetermined Quantity Of Water In Accordance With Specification To Form Dense Mass Which Is Spread And Rolled With Vibratory Roller 80/100kn Capacity Speed Of Which Should Not Exceed 5km/hour For Each Layer, Rolling Should Continue Till 98% Density Is Achieved To Approved Grade And X-section The Mixing Is To Be Prepared In Approved Mech, Mixing Plant Of Suitable Capacity Including Laying Of Cold Emulsion With Pressure Sprayer At The Rate 0.75 Kgs/sqm Complete, Including Cost Of All Materials, All Leads Lifts Octroi Charge Taxes Etc, Providing And Applying Tack Coat Using Hot Straight Run Bitumen Of Grade 80 100 Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface To Remove All Dirt, Dust, Mud Etc., Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate Of Quality Size And Grading As Specified In Morth And Straight Run Bitumen Of Grade 80 100 3 By Weight Of Total Mix 60kg Cum, Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate Satisfying The Gradation Set Out In Specification With 5 Binder Content By Weight Of Total Mix Bitumen Of Grade 80/100 2.88kgs/sqm, Curbing Earthwork Excavation By Manual Means In Trenches In All Kinds Of Soil For Foundations Incl. Disposal Of Excavated Earth Beyond The Site Or As Directed, Disposed Earth Is To Be Levelled And Neatly Dressed Incl. Dewatering Of Trenches During Execution If Required., Providing And Laying Stone Soling Dully Hand Packed Incl Ramming With Heavy Hand Rammer All Carriage Upto Site Of Work, Providing And Laying In Position Cement Concrete Of Specified Grade Excl. The Cost Of Cantering, Shuttering In 1 4 8 With 1cement 4 Coarse Sand 8 Graded Stone Agg. 40mm Nominal Size Crushed Aggregate Incl. All Carriage Upto Site Of Work., Providing And Laying In Position Specified Grade Of Cement Concrete In 1 1.5 3 1 Cement 1.5 Course Sand 3 Graded Stone Agg 20mm Nominal Size Aggregates Excl. The Cost Of Cantering Shuttering Finishing ,in Beams, Lintels, Slab Etc Up To Floor V-level, Centering And Shuttering Incl Strutting Propping Etc And Removal Of Form Work For Foundation Footing Bases Of Columns, Synthetic Layer. All Weather Synthetic Surface 8 Layers 1 Layer Of Filler Resurface, 3 Layer Of Fine Cushion, 3 Layer Of Colour, 1 Layer Court Line Marking, Supply & Installation Of Badminton Post With Net Pulley System (movable Type) Of Approved Quality And Standard Manufacturer., Badminton Racket Branded (regular Palms & Light Weight), Water Remover Roller Imported, Water Drainage System, Tarpaulin 20ft X 45ft, Digital Score Board With Accessories 2 By 3, Led Sports Light Installation Of Four 20 Feet Height Ms Electric Pole From Ground Level Ms Medium Pipe Including Square Frame For Lights Make A Square Frame Of Ms Pipe And Installation 2 Each Poles 150 Watt Led Light Including Mcb/aluminium Wire/switch Board With Control Unit Etc., Installation And Commission Charges in Jammu & Kashmir.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for Tender For Construction Of Badminton Court Construction Sub Base And Base 168 Sqm , Supply And Stacking Of Graded Stone Aggregate , Providing And Laying Wet Mix Macadam On Prepared Sub Grade Sub Base , Providing And Applying Tack Coat Using Hot Straight Run Bitumen , Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate , Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate , Curbing , Providing And Laying Stone Soling Dully Hand Packed , Providing And Laying In Position Cement Concrete , Providing And Laying In Position Specified Grade Of Cement Concrete , Centring And Shuttering , Synthetic Layer , Supply And Installation Of Badminton Post , Badminton Racket Branded , Water Remover Roller Imported , Water Drainage System , Tarpaulin , Digital Score Board With Accessories 2 By 3 , Led Sports Light , Installation And Commission Charges, Construction Of Badminton Court, Construction Sub Base & Base 168 Sqm Preparation Of Sub Grade By Excavating Earth To An Average Of 22.5cm Depth, Dressing And Consolidation With Power Road Roller Of 8-10 Tonne Capacity Incl. Making Good The Undulations Etc. With Earth Or Quarry Spoils Etc. And Rerolling The Subgrade Incl. Disposal Of Excavated Soil Upto 100 Mtrs Or As Directed By Engineer Incharge At Site Disposed Earth Is To Be Levelled & Neatly Dressed With All Leads, Lifts And Carriages Complete, Supply & Stacking Of Graded Stone Aggregate Stone Screening And Binding Material At Site Incl. Laying Of Water Bound Macaddam With Specified Stone Aggregate, Stone Screening And Binding Material Incl. Screening, Sorting, Spreading To Template And Consolidation With Prr Of 8-10 Tonne Capacity Etc. Complete With All Carriage. Base Course With Stone Aggregate 63-45mm Incl. Stone Screening 13.2mm, Providing And Laying Wet Mix Macadam On Prepared Sub Grade/sub Base With Crushed Quarry Stone Aggregate Of Specified Grading As Per Irc/most Specification Including Mixing Crushed Material With Predetermined Quantity Of Water In Accordance With Specification To Form Dense Mass Which Is Spread And Rolled With Vibratory Roller 80/100kn Capacity Speed Of Which Should Not Exceed 5km/hour For Each Layer, Rolling Should Continue Till 98% Density Is Achieved To Approved Grade And X-section The Mixing Is To Be Prepared In Approved Mech, Mixing Plant Of Suitable Capacity Including Laying Of Cold Emulsion With Pressure Sprayer At The Rate 0.75 Kgs/sqm Complete, Including Cost Of All Materials, All Leads Lifts Octroi Charge Taxes Etc, Providing And Applying Tack Coat Using Hot Straight Run Bitumen Of Grade 80 100 Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface To Remove All Dirt, Dust, Mud Etc., Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate Of Quality Size And Grading As Specified In Morth And Straight Run Bitumen Of Grade 80 100 3 By Weight Of Total Mix 60kg Cum, Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate Satisfying The Gradation Set Out In Specification With 5 Binder Content By Weight Of Total Mix Bitumen Of Grade 80/100 2.88kgs/sqm, Curbing Earthwork Excavation By Manual Means In Trenches In All Kinds Of Soil For Foundations Incl. Disposal Of Excavated Earth Beyond The Site Or As Directed, Disposed Earth Is To Be Levelled And Neatly Dressed Incl. Dewatering Of Trenches During Execution If Required., Providing And Laying Stone Soling Dully Hand Packed Incl Ramming With Heavy Hand Rammer All Carriage Upto Site Of Work, Providing And Laying In Position Cement Concrete Of Specified Grade Excl. The Cost Of Cantering, Shuttering In 1 4 8 With 1cement 4 Coarse Sand 8 Graded Stone Agg. 40mm Nominal Size Crushed Aggregate Incl. All Carriage Upto Site Of Work., Providing And Laying In Position Specified Grade Of Cement Concrete In 1 1.5 3 1 Cement 1.5 Course Sand 3 Graded Stone Agg 20mm Nominal Size Aggregates Excl. The Cost Of Cantering Shuttering Finishing ,in Beams, Lintels, Slab Etc Up To Floor V-level, Centering And Shuttering Incl Strutting Propping Etc And Removal Of Form Work For Foundation Footing Bases Of Columns, Synthetic Layer. All Weather Synthetic Surface 8 Layers 1 Layer Of Filler Resurface, 3 Layer Of Fine Cushion, 3 Layer Of Colour, 1 Layer Court Line Marking, Supply & Installation Of Badminton Post With Net Pulley System (movable Type) Of Approved Quality And Standard Manufacturer., Badminton Racket Branded (regular Palms & Light Weight), Water Remover Roller Imported, Water Drainage System, Tarpaulin 20ft X 45ft, Digital Score Board With Accessories 2 By 3, Led Sports Light Installation Of Four 20 Feet Height Ms Electric Pole From Ground Level Ms Medium Pipe Including Square Frame For Lights Make A Square Frame Of Ms Pipe And Installation 2 Each Poles 150 Watt Led Light Including Mcb/aluminium Wire/switch Board With Control Unit Etc., Installation And Commission Charges. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Srinagar.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Indian Army

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these contracts, companies must prepare their core compliance documents. Vendors operating across Jammu & Kashmir must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Srinagar region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for Tender For Construction Of Badminton Court Construction Sub Base And Base 168 Sqm , Supply And Stacking Of Graded Stone Aggregate , Providing And Laying Wet Mix Macadam On Prepared Sub Grade Sub Base , Providing And Applying Tack Coat Using Hot Straight Run Bitumen , Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate , Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate , Curbing , Providing And Laying Stone Soling Dully Hand Packed , Providing And Laying In Position Cement Concrete , Providing And Laying In Position Specified Grade Of Cement Concrete , Centring And Shuttering , Synthetic Layer , Supply And Installation Of Badminton Post , Badminton Racket Branded , Water Remover Roller Imported , Water Drainage System , Tarpaulin , Digital Score Board With Accessories 2 By 3 , Led Sports Light , Installation And Commission Charges, Construction Of Badminton Court, Construction Sub Base & Base 168 Sqm Preparation Of Sub Grade By Excavating Earth To An Average Of 22.5cm Depth, Dressing And Consolidation With Power Road Roller Of 8-10 Tonne Capacity Incl. Making Good The Undulations Etc. With Earth Or Quarry Spoils Etc. And Rerolling The Subgrade Incl. Disposal Of Excavated Soil Upto 100 Mtrs Or As Directed By Engineer Incharge At Site Disposed Earth Is To Be Levelled & Neatly Dressed With All Leads, Lifts And Carriages Complete, Supply & Stacking Of Graded Stone Aggregate Stone Screening And Binding Material At Site Incl. Laying Of Water Bound Macaddam With Specified Stone Aggregate, Stone Screening And Binding Material Incl. Screening, Sorting, Spreading To Template And Consolidation With Prr Of 8-10 Tonne Capacity Etc. Complete With All Carriage. Base Course With Stone Aggregate 63-45mm Incl. Stone Screening 13.2mm, Providing And Laying Wet Mix Macadam On Prepared Sub Grade/sub Base With Crushed Quarry Stone Aggregate Of Specified Grading As Per Irc/most Specification Including Mixing Crushed Material With Predetermined Quantity Of Water In Accordance With Specification To Form Dense Mass Which Is Spread And Rolled With Vibratory Roller 80/100kn Capacity Speed Of Which Should Not Exceed 5km/hour For Each Layer, Rolling Should Continue Till 98% Density Is Achieved To Approved Grade And X-section The Mixing Is To Be Prepared In Approved Mech, Mixing Plant Of Suitable Capacity Including Laying Of Cold Emulsion With Pressure Sprayer At The Rate 0.75 Kgs/sqm Complete, Including Cost Of All Materials, All Leads Lifts Octroi Charge Taxes Etc, Providing And Applying Tack Coat Using Hot Straight Run Bitumen Of Grade 80 100 Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface To Remove All Dirt, Dust, Mud Etc., Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate Of Quality Size And Grading As Specified In Morth And Straight Run Bitumen Of Grade 80 100 3 By Weight Of Total Mix 60kg Cum, Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate Satisfying The Gradation Set Out In Specification With 5 Binder Content By Weight Of Total Mix Bitumen Of Grade 80/100 2.88kgs/sqm, Curbing Earthwork Excavation By Manual Means In Trenches In All Kinds Of Soil For Foundations Incl. Disposal Of Excavated Earth Beyond The Site Or As Directed, Disposed Earth Is To Be Levelled And Neatly Dressed Incl. Dewatering Of Trenches During Execution If Required., Providing And Laying Stone Soling Dully Hand Packed Incl Ramming With Heavy Hand Rammer All Carriage Upto Site Of Work, Providing And Laying In Position Cement Concrete Of Specified Grade Excl. The Cost Of Cantering, Shuttering In 1 4 8 With 1cement 4 Coarse Sand 8 Graded Stone Agg. 40mm Nominal Size Crushed Aggregate Incl. All Carriage Upto Site Of Work., Providing And Laying In Position Specified Grade Of Cement Concrete In 1 1.5 3 1 Cement 1.5 Course Sand 3 Graded Stone Agg 20mm Nominal Size Aggregates Excl. The Cost Of Cantering Shuttering Finishing ,in Beams, Lintels, Slab Etc Up To Floor V-level, Centering And Shuttering Incl Strutting Propping Etc And Removal Of Form Work For Foundation Footing Bases Of Columns, Synthetic Layer. All Weather Synthetic Surface 8 Layers 1 Layer Of Filler Resurface, 3 Layer Of Fine Cushion, 3 Layer Of Colour, 1 Layer Court Line Marking, Supply & Installation Of Badminton Post With Net Pulley System (movable Type) Of Approved Quality And Standard Manufacturer., Badminton Racket Branded (regular Palms & Light Weight), Water Remover Roller Imported, Water Drainage System, Tarpaulin 20ft X 45ft, Digital Score Board With Accessories 2 By 3, Led Sports Light Installation Of Four 20 Feet Height Ms Electric Pole From Ground Level Ms Medium Pipe Including Square Frame For Lights Make A Square Frame Of Ms Pipe And Installation 2 Each Poles 150 Watt Led Light Including Mcb/aluminium Wire/switch Board With Control Unit Etc., Installation And Commission Charges by Indian Army

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for Tender For Construction Of Badminton Court Construction Sub Base And Base 168 Sqm , Supply And Stacking Of Graded Stone Aggregate , Providing And Laying Wet Mix Macadam On Prepared Sub Grade Sub Base , Providing And Applying Tack Coat Using Hot Straight Run Bitumen , Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate , Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate , Curbing , Providing And Laying Stone Soling Dully Hand Packed , Providing And Laying In Position Cement Concrete , Providing And Laying In Position Specified Grade Of Cement Concrete , Centring And Shuttering , Synthetic Layer , Supply And Installation Of Badminton Post , Badminton Racket Branded , Water Remover Roller Imported , Water Drainage System , Tarpaulin , Digital Score Board With Accessories 2 By 3 , Led Sports Light , Installation And Commission Charges, Construction Of Badminton Court, Construction Sub Base & Base 168 Sqm Preparation Of Sub Grade By Excavating Earth To An Average Of 22.5cm Depth, Dressing And Consolidation With Power Road Roller Of 8-10 Tonne Capacity Incl. Making Good The Undulations Etc. With Earth Or Quarry Spoils Etc. And Rerolling The Subgrade Incl. Disposal Of Excavated Soil Upto 100 Mtrs Or As Directed By Engineer Incharge At Site Disposed Earth Is To Be Levelled & Neatly Dressed With All Leads, Lifts And Carriages Complete, Supply & Stacking Of Graded Stone Aggregate Stone Screening And Binding Material At Site Incl. Laying Of Water Bound Macaddam With Specified Stone Aggregate, Stone Screening And Binding Material Incl. Screening, Sorting, Spreading To Template And Consolidation With Prr Of 8-10 Tonne Capacity Etc. Complete With All Carriage. Base Course With Stone Aggregate 63-45mm Incl. Stone Screening 13.2mm, Providing And Laying Wet Mix Macadam On Prepared Sub Grade/sub Base With Crushed Quarry Stone Aggregate Of Specified Grading As Per Irc/most Specification Including Mixing Crushed Material With Predetermined Quantity Of Water In Accordance With Specification To Form Dense Mass Which Is Spread And Rolled With Vibratory Roller 80/100kn Capacity Speed Of Which Should Not Exceed 5km/hour For Each Layer, Rolling Should Continue Till 98% Density Is Achieved To Approved Grade And X-section The Mixing Is To Be Prepared In Approved Mech, Mixing Plant Of Suitable Capacity Including Laying Of Cold Emulsion With Pressure Sprayer At The Rate 0.75 Kgs/sqm Complete, Including Cost Of All Materials, All Leads Lifts Octroi Charge Taxes Etc, Providing And Applying Tack Coat Using Hot Straight Run Bitumen Of Grade 80 100 Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface To Remove All Dirt, Dust, Mud Etc., Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate Of Quality Size And Grading As Specified In Morth And Straight Run Bitumen Of Grade 80 100 3 By Weight Of Total Mix 60kg Cum, Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate Satisfying The Gradation Set Out In Specification With 5 Binder Content By Weight Of Total Mix Bitumen Of Grade 80/100 2.88kgs/sqm, Curbing Earthwork Excavation By Manual Means In Trenches In All Kinds Of Soil For Foundations Incl. Disposal Of Excavated Earth Beyond The Site Or As Directed, Disposed Earth Is To Be Levelled And Neatly Dressed Incl. Dewatering Of Trenches During Execution If Required., Providing And Laying Stone Soling Dully Hand Packed Incl Ramming With Heavy Hand Rammer All Carriage Upto Site Of Work, Providing And Laying In Position Cement Concrete Of Specified Grade Excl. The Cost Of Cantering, Shuttering In 1 4 8 With 1cement 4 Coarse Sand 8 Graded Stone Agg. 40mm Nominal Size Crushed Aggregate Incl. All Carriage Upto Site Of Work., Providing And Laying In Position Specified Grade Of Cement Concrete In 1 1.5 3 1 Cement 1.5 Course Sand 3 Graded Stone Agg 20mm Nominal Size Aggregates Excl. The Cost Of Cantering Shuttering Finishing ,in Beams, Lintels, Slab Etc Up To Floor V-level, Centering And Shuttering Incl Strutting Propping Etc And Removal Of Form Work For Foundation Footing Bases Of Columns, Synthetic Layer. All Weather Synthetic Surface 8 Layers 1 Layer Of Filler Resurface, 3 Layer Of Fine Cushion, 3 Layer Of Colour, 1 Layer Court Line Marking, Supply & Installation Of Badminton Post With Net Pulley System (movable Type) Of Approved Quality And Standard Manufacturer., Badminton Racket Branded (regular Palms & Light Weight), Water Remover Roller Imported, Water Drainage System, Tarpaulin 20ft X 45ft, Digital Score Board With Accessories 2 By 3, Led Sports Light Installation Of Four 20 Feet Height Ms Electric Pole From Ground Level Ms Medium Pipe Including Square Frame For Lights Make A Square Frame Of Ms Pipe And Installation 2 Each Poles 150 Watt Led Light Including Mcb/aluminium Wire/switch Board With Control Unit Etc., Installation And Commission Charges within the Jammu & Kashmir jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for Tender For Construction Of Badminton Court Construction Sub Base And Base 168 Sqm , Supply And Stacking Of Graded Stone Aggregate , Providing And Laying Wet Mix Macadam On Prepared Sub Grade Sub Base , Providing And Applying Tack Coat Using Hot Straight Run Bitumen , Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate , Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate , Curbing , Providing And Laying Stone Soling Dully Hand Packed , Providing And Laying In Position Cement Concrete , Providing And Laying In Position Specified Grade Of Cement Concrete , Centring And Shuttering , Synthetic Layer , Supply And Installation Of Badminton Post , Badminton Racket Branded , Water Remover Roller Imported , Water Drainage System , Tarpaulin , Digital Score Board With Accessories 2 By 3 , Led Sports Light , Installation And Commission Charges, Construction Of Badminton Court, Construction Sub Base & Base 168 Sqm Preparation Of Sub Grade By Excavating Earth To An Average Of 22.5cm Depth, Dressing And Consolidation With Power Road Roller Of 8-10 Tonne Capacity Incl. Making Good The Undulations Etc. With Earth Or Quarry Spoils Etc. And Rerolling The Subgrade Incl. Disposal Of Excavated Soil Upto 100 Mtrs Or As Directed By Engineer Incharge At Site Disposed Earth Is To Be Levelled & Neatly Dressed With All Leads, Lifts And Carriages Complete, Supply & Stacking Of Graded Stone Aggregate Stone Screening And Binding Material At Site Incl. Laying Of Water Bound Macaddam With Specified Stone Aggregate, Stone Screening And Binding Material Incl. Screening, Sorting, Spreading To Template And Consolidation With Prr Of 8-10 Tonne Capacity Etc. Complete With All Carriage. Base Course With Stone Aggregate 63-45mm Incl. Stone Screening 13.2mm, Providing And Laying Wet Mix Macadam On Prepared Sub Grade/sub Base With Crushed Quarry Stone Aggregate Of Specified Grading As Per Irc/most Specification Including Mixing Crushed Material With Predetermined Quantity Of Water In Accordance With Specification To Form Dense Mass Which Is Spread And Rolled With Vibratory Roller 80/100kn Capacity Speed Of Which Should Not Exceed 5km/hour For Each Layer, Rolling Should Continue Till 98% Density Is Achieved To Approved Grade And X-section The Mixing Is To Be Prepared In Approved Mech, Mixing Plant Of Suitable Capacity Including Laying Of Cold Emulsion With Pressure Sprayer At The Rate 0.75 Kgs/sqm Complete, Including Cost Of All Materials, All Leads Lifts Octroi Charge Taxes Etc, Providing And Applying Tack Coat Using Hot Straight Run Bitumen Of Grade 80 100 Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface To Remove All Dirt, Dust, Mud Etc., Providing And Laying 15mm Thick Premix Bituminous Macadam Base Course With Stone Aggregate Of Quality Size And Grading As Specified In Morth And Straight Run Bitumen Of Grade 80 100 3 By Weight Of Total Mix 60kg Cum, Providing And Laying 15mm Thick Semidence Bituminous Concrete Using Material Aggregate Satisfying The Gradation Set Out In Specification With 5 Binder Content By Weight Of Total Mix Bitumen Of Grade 80/100 2.88kgs/sqm, Curbing Earthwork Excavation By Manual Means In Trenches In All Kinds Of Soil For Foundations Incl. Disposal Of Excavated Earth Beyond The Site Or As Directed, Disposed Earth Is To Be Levelled And Neatly Dressed Incl. Dewatering Of Trenches During Execution If Required., Providing And Laying Stone Soling Dully Hand Packed Incl Ramming With Heavy Hand Rammer All Carriage Upto Site Of Work, Providing And Laying In Position Cement Concrete Of Specified Grade Excl. The Cost Of Cantering, Shuttering In 1 4 8 With 1cement 4 Coarse Sand 8 Graded Stone Agg. 40mm Nominal Size Crushed Aggregate Incl. All Carriage Upto Site Of Work., Providing And Laying In Position Specified Grade Of Cement Concrete In 1 1.5 3 1 Cement 1.5 Course Sand 3 Graded Stone Agg 20mm Nominal Size Aggregates Excl. The Cost Of Cantering Shuttering Finishing ,in Beams, Lintels, Slab Etc Up To Floor V-level, Centering And Shuttering Incl Strutting Propping Etc And Removal Of Form Work For Foundation Footing Bases Of Columns, Synthetic Layer. All Weather Synthetic Surface 8 Layers 1 Layer Of Filler Resurface, 3 Layer Of Fine Cushion, 3 Layer Of Colour, 1 Layer Court Line Marking, Supply & Installation Of Badminton Post With Net Pulley System (movable Type) Of Approved Quality And Standard Manufacturer., Badminton Racket Branded (regular Palms & Light Weight), Water Remover Roller Imported, Water Drainage System, Tarpaulin 20ft X 45ft, Digital Score Board With Accessories 2 By 3, Led Sports Light Installation Of Four 20 Feet Height Ms Electric Pole From Ground Level Ms Medium Pipe Including Square Frame For Lights Make A Square Frame Of Ms Pipe And Installation 2 Each Poles 150 Watt Led Light Including Mcb/aluminium Wire/switch Board With Control Unit Etc., Installation And Commission Charges are available inside the detailed notification files. Bidders planning to target this contract in Srinagar should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Get Expert Tender Bidding Support

Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.

Call Our Expert: +91 7069661818
Your Information Is 100% Secure & Confidential